Plovdiv-Svilengrad railway electrification and upgrading of corridors IV and IX.  Phase I: Kroumovo-Parvomai civil, track and electrification works - Bulgaria
Plovdiv-Svilengrad railway electrification and upgrading of corridors IV and IX.  Phase I: Kroumovo-Parvomai civil, track and electrification works - Bulgaria

CATEGORY: Transport infrastructure, Inter-city Passenger & Freight

LOCATION: Bulgaria

START/END: 2006 - 2009

CLIENT: TERNA S.A. BRANCH BULGARIA

ORIGIN OF FUNDING: ISPA

PROJECT VALUE: 160,000

LDK’s BUDGET SHARE: 100%

STAFF PROVIDED: 3

Plovdiv-Svilengrad railway electrification and upgrading of corridors IV and IX.  Phase I: Kroumovo-Parvomai civil, track and electrification works - Bulgaria

Type of Services

  1. Traction power simulation study
  2. Electromagnetic compatibility study
  3. 25 kV AC Overhead Contact Line (OCL), design
  4. Foundations for masts and portals

 

 

Description

Plovdiv-Svilengrad railway electrification and upgrading of corridors IV and IX.

Phase I: Kroumovo-Parvomai civil, track and electrification works

Design and Construction Works for the upgrading / rehabilitation of civil, track and electrification works of the double/single track railway between Kroumovo and Parvomai over an approximate length of 37 kilometres.

The works include the upgrading of tracks and stations, the reconstruction of buildings for 8 stations and halts, and the construction of two new Traction Power Substations at Kroumovo and Parvomai. The total cost of the project is 85.000.000 EUR.

The railway line forms part of priority TINA Corridor IV and (in part) Corridor IX and provides the main railway connection between Bulgaria, Turkey and the Middle East. The upgraded line will also improve access to Greece and the port of Alexandroupolis.