ldk.gr - Header Section

ldk.gr - Main Section

News

Technical Advice for structuring a public-private partnership transaction for Zarqa Industrial Wastewater Treatment Plant/ TA2017034 JONIF, Jordan
Technical Advice for structuring a public-private partnership transaction for Zarqa Industrial Wastewater Treatment Plant/ TA2017034 JONIF, Jordan

CATEGORY: Environment, Impact Assessment

LOCATION: Jordan

START/END: 2017 - ongoing

CLIENT: Safege

ORIGIN OF FUNDING: European Investment Bank (EIB)

PROJECT VALUE: 267,118

LDK’s BUDGET SHARE: 100%

Technical Advice for structuring a public-private partnership transaction for Zarqa Industrial Wastewater Treatment Plant/ TA2017034 JONIF, Jordan

Type of Services

Baseline study including:

  • Industry survey (identification of industrial stakeholders and interview including: Name and contact details of the industrial stakeholder, as well as name of the interviewer; type of industry; Overview of the process to understand the quality and quantity of wastewater produced; Overview of the financial aspects of the business to estimate the capacity to pay for a water; treatment system; Water consumption (mean and peak); Estimated wastewater production: quantity, quality; Wastewater quality and quantity data, if any; Situation regarding actual water treatment: actual deposit site, actual transport mean, actual cost; Difficulties faced regarding wastewater disposal and treatment; and Estimation of the capacity and the willingness to pay for an improved wastewater treatment service.
  • Survey on wastewater treatment and collection including regional market analysis of the existing alternative solutions for a wastewater collection network, identification and interview tanker fleets owners and companies / individuals offering wastewater collection services. Survey will include technical aspects such as size of the tank, traceability solutions and monitoring, control mechanisms, size of company, quality certificates, turnover, willingness to expand, evaluation of its reliability and services cost estimate.
  • Topographic survey including plan table and levelling survey.
  • Establishment of a legal, institutional and technical baseline

Technical study including:

  • Review, update and prepare design criteria (design flow rates, peak factors, limits of work, raw water chemical composition, treated effluent and sludge quality requirements;
  • Determination of effluent and sludge reuse solutions;
  • Establishment of Project phasing;
  • WW treatment options and priorities
  • Multicriteria analysis (MCA) to determine the three most relevant solutions, including the following criteria: Ecological criteria (effectiveness of wastewater treatment, quality of the effluent and sludge for reuse purposes); Environmental criteria (effect on the natural environment and aesthetics); Technical criteria (ease of operation and maintenance and modern solutions); Economic criteria (costs of investment and operation); and Reliability criterion (reliability of operation).

Feasibility study

  • Preparation of layout and preliminary engineering design. Each of the three solutions will are carefully studied, in order to facilitate the comparison focusing on: Site issues: land availability, characteristics and drainage; Treatment process: hydro-structural design, process and mechanical design; Energy issues: requirements and accessibility, own-production; and Climate footprint: estimation of emissions during the construction and operational phases.
  • Environmental and Social Impact Assessment (ESIA) and Gender Assessment
  • Market sounding
  • Assessment of project risks, uncertainties and responsibilities and their allocation
  • Cost estimates and Cost benefit analysis (CBA)
  • Financial and economic analysis
  • Funding gap and affordability assessment
  • PPP model evaluation, suitability and value for money analysis, roadmap
  • Geotechnical study

Preparation of tender documents

  • Technical support in pre-qualification stage
  • Preparation of technical tender documents

Description

The Kingdom of Jordan is a semi-arid country of about 9.5 million people located on the Eastern Bank of the Jordan River. The country’s economy is classified as upper middle income, very attractive to foreign investors and based on a skilled workforce. In Jordan the demand for water often exceeds the available supply. On a per capita basis, Jordan has one of the lowest available water supplies in the world.  Zarqa, a city 25 km away from Amman, hosts on its territory 50% of the country’s industry and 15% of its inhabitants. Around Zarqa, approximately 250 industries of small to medium or big size are having a significant impact on water consumption and wastewater generation. The environmental situation in Zarqa is worrying, as the surface and groundwater resources are contaminated with industrial pollutants. In particular, the Zarqa River, the second largest tributary of the lower Jordan River, is highly polluted. The restoration of the Zarqa River is one of the top priorities of the Jordanian Ministry of the Environment.

Currently, there is no centralized industrial wastewater treatment plant (IWWTP) in Zarqa, and a large number of industrial facilities in Zarqa cannot be connected to an existing sewer system due to the expansion of the industrial zone. As a result, a new IWWTP in Zarqa is of major importance for the whole country.

Funded through the Framework agreement to support European Investment Bank (EIB) advisory services activities inside and outside EU-28 / Lot 1: Environment, the Assignment Technical advice for structuring a public-private partnership transaction for the Zarqa IWWTP  TA2017034 JO NIF aims to support the Government of Jordan in the preparation of the project for the Zarqa IWWTP, which will develop a cost-effective treatment and disposal alternative as well as provide opportunities for improved resources management via effluent and sludge reuse. The project will also support the integrated water resources management and wastewater pollution abatement in the regional industrial sector.

ldk.gr - Bottom info

ldk.gr - Home Section

lines green

Environmental

PROJECTS

Environmental and Social Impact Assessment (ESIA) for Issuing Environmental Terms for the new Onshore Katakolo Development Project, Greece

Environmental and Social Impact Assessment (ESIA) for Issuing Environmental Terms for the new Onshore Katakolo Development Project, Greece

The goal of this project is the on-time issuing of the Terms of Environment (TOE - ΑΕΠΟ) for the Katakolo new Development Project by the Greek ...

Environmental and Social Impact Study (ESIA) for Issuing Environmental Terms for the new Prinos Development Project and for amending the existing Offshore Environmental Approved Terms

Environmental and Social Impact Study (ESIA) for Issuing Environmental Terms for the new Prinos Development Project and for amending the existing Offshore Environmental Approved Terms

Energean Oil and Gas intends to increase production from its Prinos concession area and has therefore initiated the Prinos Exploration Area field ...

Environmental Impact Assessment (EIA) for the Saudi Arabian Railway Northern Branch Lines

Environmental Impact Assessment (EIA) for the Saudi Arabian Railway Northern Branch Lines

The project is part of the overall Northern Branch Lines (NBL). This will include three (3) new lines as extensions to the existing SAR network. ...

Mediterranean Hot Spot Investment Programme - Project Preparation and Implementation Facility (MeHSIP-PPIF), southern Mediterranean countries

Mediterranean Hot Spot Investment Programme - Project Preparation and Implementation Facility (MeHSIP-PPIF), southern Mediterranean countries

The Mediterranean environment is recognised as one of the richest and at the same time most vulnerable in the world. The region is predominantly arid ...

Environmental impact assessment and remediation plans of ten high priority environmental hot spots, as the basis for a major remediation programme, Albania

Environmental impact assessment and remediation plans of ten high priority environmental hot spots, as the basis for a major remediation programme, Albania

Within the framework of the United Nations Development Programme (UNDP) Project "Identification and prioritization of Environmental Hot Spots in ...

Environmental site assessment: Phases I & II for an office & warehouse complex, Greece

Environmental site assessment: Phases I & II for an office & warehouse complex, Greece

The project refers to the elaboration of a Phase I and Phase II Environmental Site Assessments, which comprised of a detailed assessment of the ...

Health & Safety review: Regulation registry for offices & laboratories, Greece

Health & Safety review: Regulation registry for offices & laboratories, Greece

The project referred to the elaboration of a thorough review on all applicable legislation in Greece for the compliance with occupational health ...

Environmental due diligence: Oil & fats production plant and food processing industrial unit, Greece

Environmental due diligence: Oil & fats production plant and food processing industrial unit, Greece

The project involved the environmental and safety site assessment at the edible oil and fats production plant in Piraeus and at the tomatoes ...

Derveni 24MW Wind Farm in Alexandroupoli (Greece) – Environmental and Social Due Diligence Report and Environmental and Social Action Plan (ESAP),  Alexandroupoli, Greece

Derveni 24MW Wind Farm in Alexandroupoli (Greece) – Environmental and Social Due Diligence Report and Environmental and Social Action Plan (ESAP), Alexandroupoli, Greece

LDK S.A. was appointed by ALPHA BANK S.A. (the Bank) to carry out E&S Due Diligence for the project. The scope of the review and analysis was to ...

Private Sector Participation in Albanian Electricity Company KESH, Albania

Private Sector Participation in Albanian Electricity Company KESH, Albania

Many reforms have been initiated in the Albanian power sector in recent years. KESH has been partly unbundled recently with the creation of a ...

Slaughterhouse : Design of wastewater treatment plant and modification of environmental terms and conditions, Greece

Slaughterhouse : Design of wastewater treatment plant and modification of environmental terms and conditions, Greece

This project included the design of the wastewater treatment plant for a slaughterhouse in Sperchiada, located in central Greece. Along with the ...

Environmental and health & safety audit: Waste management facility, Greece

Environmental and health & safety audit: Waste management facility, Greece

The project refers to the elaboration of an audit at the premises of a Greek waste vendor of Avon cosmetics company. The audit was conducted on ...

Technical Advice for structuring a public-private partnership transaction for Zarqa Industrial Wastewater Treatment Plant/ TA2017034 JONIF, Jordan

Technical Advice for structuring a public-private partnership transaction for Zarqa Industrial Wastewater Treatment Plant/ TA2017034 JONIF, Jordan

The Kingdom of Jordan is a semi-arid country of about 9.5 million people located on the Eastern Bank of the Jordan River. The country’s economy is ...

Health & Safety- Regulation registry for malls and commercial complexes, Greece

Health & Safety- Regulation registry for malls and commercial complexes, Greece

The project referred to the elaboration of a thorough review on all applicable legislation in Greece for the compliance with occupational health ...

Health & Safety review: Regulation registry & questionnaire for offices & laboratories, Greece

Health & Safety review: Regulation registry & questionnaire for offices & laboratories, Greece

The project refers to the preparation of occupational health & safety legislation databases, wherein short descriptions of the relevant pieces of ...

Lykovouni Onshore Wind Farm, Greece

Lykovouni Onshore Wind Farm, Greece

The European Bank for Reconstruction and Development (EBRD) considers to provide finance for the construction and operation of the onshore Lykovouni ...

Environmental study for the installation and operation of electricity production photovoltaic systems for the Athens Tram company, Greece

Environmental study for the installation and operation of electricity production photovoltaic systems for the Athens Tram company, Greece

The Athens Tram SA, operating company of the Athens modern tramway, has been nominated with an exception license of the responsibility to receive ...

Hydrocarbon Exploration Drilling Programme - Environmental Impact Assessments

Hydrocarbon Exploration Drilling Programme - Environmental Impact Assessments

In the framework of the Hydrocarbon Exploration Drilling Programme in Western Greece, several Environmental Impact Assessment Studies for test ...

Health & Safety compliance study: Tower works, Greece

Health & Safety compliance study: Tower works, Greece

The project referred to a desk study on occupational health & safety compliance requirements for subcontractors in respect to soil excavations, ...

Rehabilitation of LiNOS Oil Refinery Plant, Ukraine

Rehabilitation of LiNOS Oil Refinery Plant, Ukraine

This project referred to the provision of independent consultancy services to assist TNK-Ukraine on independent evaluation of selected technical, ...

EIA and accession to the Emissions Trading Scheme for a paper manufacturing plant in Katerini, Greece

EIA and accession to the Emissions Trading Scheme for a paper manufacturing plant in Katerini, Greece

This paper manufacturing plant, located in Katerini of northern Greece, is a newly acquired member of a multinational paper industry group. In view ...

sector inner module transport bg min